Project Name: 39kVA Information Center Backup Power Project in Sunwoda Golden Leaf Park
Application scenario: Information room
Time: 2020.06
Location: Shenzhen, Guangdong
Installed capacity: 25.6kWh
Battery system: 480V50Ah
Project introduction: This project is a backup system for the server in the information computer room of Shenzhen Jinye Industrial Park. It is used as an uninterruptible power supply. It can continue to supply power to the server in the computer room when the mains power is off to ensure the normal operation of the equipment in the computer room. The UPS battery part uses lithium batteries. Instead of traditional lead-acid batteries, it improves the overall service life of the UPS system, reduces the space occupied, and meets the demand for large-rate discharge. At the same time, it has the advantage of maintenance-free and reduces the maintenance cost of the system.