40kVA UPS Lithium-ion System Project in Sunwoda Boluo Park

Project: 40kVA UPS Lithium-ion System Project in Sunwoda Boluo Park

Application: Data Center

Date: Mar., 2018

Location: Huizhou Guangdong

Installed capacity: 40kWh

Introduction: The project aimed to provide IDC server in Sunwoda Boluo Park with the backup power system by means of using UPS to supply power continuously even in blackouts and ensure equipment normal operation in data center. Replacing traditional lead-acid packs with lithium-ion packs not only increases the service life of UPS system, reduces footprint and meets the high-rate discharging demand, but also reduces maintenance cost of UPS system and achieves maintenance free.


sunwoda data center backup power Boluo Park