Project: 40kVA UPS Lithium-ion System Project in Sunwoda Boluo Park
Application: Data Center
Date: Mar., 2018
Location: Huizhou Guangdong
Installed capacity: 40kWh
Introduction: The project aimed to provide IDC server in Sunwoda Boluo Park with the backup power system by means of using UPS to supply power continuously even in blackouts and ensure equipment normal operation in data center. Replacing traditional lead-acid packs with lithium-ion packs not only increases the service life of UPS system, reduces footprint and meets the high-rate discharging demand, but also reduces maintenance cost of UPS system and achieves maintenance free.